AceMQ assesses your current platform, plans the move, rehearses it on a copy of your data and cuts over with a tested rollback plan. Then we run the new platform under 24/7 support or as a managed service, so the engineers who moved it are the ones on call afterwards. Our database migration services cover the migration assessment, migration planning, data integrity checks and post-migration support, including moves to a cloud database such as Aurora PostgreSQL.
160+ customers10+ years15-min Sev 1 responseQuotes in 1 hour
Every migration ships withWritten down before any data moves
A rollback plan, tested in rehearsal
A parallel run wherever the data allows it
Data validation: row counts, checksums and app checks
A runbook your team keeps
24/7 engineers on the line through cut-over
Routes
Pick your migration route
Each route links to the guide or service page that covers it in depth. If your route is not listed, ask and we will scope it.
Aurora PostgreSQL speaks the PostgreSQL protocol, but it is not the same engine underneath. We check what will not carry over, choose the move method that fits your downtime budget, and validate the data before the switch.
1. Compatibility check
Extensions, versions and parameters Aurora does not allow, superuser-only features, replication slots your applications rely on, and how Aurora's storage and I/O pricing will treat your workload.
If Aurora is the wrong target, we say so before you start.
2. Move method
AWS DMS: full load plus change data capture
Native logical replication for a short cut-over
Dump and restore for small databases with a maintenance window
3. Cut-over and checks
Row counts, checksums and application checks on both sides, then the switch, with the source kept as the rollback target until you sign off.
How we migrate
Assess, plan, rehearse, cut over, run
The same five stages on every route. Nothing moves in production until the rehearsal has been timed and the rollback has been tested.
01
Assess
Schemas, code, integrations, data volumes and the SLAs the move has to keep.
Out: risk-ranked findings
02
Plan
Target design, conversion approach, cut-over method and the rollback plan.
Out: migration runbook
03
Rehearse
Full dry runs on a copy of production data, timed, until cut-over fits the window.
Out: measured cut-over time
04
Cut over
The move itself, with go and no-go checkpoints and engineers on the line.
Out: validated target
05
Run
24/7 support or managed operations on the new platform from day one.
Out: the same team on call
Rollback plan
Written in planning and tested in rehearsal. If a go or no-go check fails, the source stays primary and nothing is lost.
Parallel run
Where the data allows, old and new run side by side through replication or dual writes until their results match.
Data validation
Row counts, checksums and application-level checks on both sides, before and after cut-over.
Planning
Routes and what sets the pace
What each route has to move, and what decides how long it takes. The assessment turns this into a real plan and timeline for your estate.
Route
What moves
What sets the pace
Oracle to PostgreSQL
Schema, PL/SQL, data, application SQL
How much PL/SQL and Oracle-only features you use
SQL Server to PostgreSQL
Schema, T-SQL, data, agent and SSIS jobs
Stored procedures and scheduled jobs
MySQL to PostgreSQL
Schema, data, application queries
Dialect differences in application code
PostgreSQL to Aurora
Data, extensions, parameters
Extensions in use and the downtime budget
Redis to Valkey
Data, configuration, clients
Modules and commands your clients depend on
Confluent Platform to Apache Kafka
Brokers, Connect, Schema Registry, clients
Confluent-only components in use
Elasticsearch to OpenSearch
Indices, mappings, clients, dashboards
Client libraries and plugins
IBM MQ or TIBCO EMS to RabbitMQ or Kafka
Queues, topics, applications, integrations
Number of applications to re-point
Hadoop or Cloudera to Databricks
Data, jobs, SQL, permissions
Job count and how much has to be rewritten
Real timelines come from the assessment and depend on data volume, code and the cut-over window.
Get a quote
Tell us where you are and where you want to land
Send the source, the target and what the platform carries. An engineer replies with an assessment plan and a quote.
Quotes answered within 1 hour · 15-min Sev 1 response · 24/7