Which Apache Hadoop versions are still supported?
Apache's download page lists 3.5.0 from April 2026, 3.4.x and 3.3.6, and the project's release-lines page names 3.4, 3.3 and 2.10 as active. The project publishes no fixed support period: a line stays active until the community declares it end of life. AceMQ supports Apache Hadoop and the Cloudera and Hortonworks distributions built on it, covering the current release and the five end-of-life release lines before it.
Do you still support Hadoop, or only migration off it?
Both. AceMQ keeps HDFS and YARN clusters stable and secure in production, and plans migrations to a lakehouse for teams that are ready. Whether to maintain or modernize is decided from your workload mix and patch position, and we say plainly if a fixable cluster does not justify a migration.
What causes NameNode heap exhaustion?
Almost always small-file sprawl. Every file and block takes roughly 150 bytes of NameNode heap regardless of its size, so millions of small files exhaust the heap even when total data looks modest. AceMQ finds the directories responsible, compacts or archives them, and sets limits so the pattern does not return.
Can you support a cluster on an end-of-life Cloudera or Hortonworks distribution?
Yes. AceMQ supports clusters on distributions that no longer receive vendor patches, with workarounds and backported mitigations for the issues that matter, and a read on exposure for regulated environments that cannot upgrade on the vendor's timeline. We also say whether migrating now or later makes more sense.
Who answers when the NameNode or YARN fails, and how fast?
A named senior AceMQ engineer joins a live bridge within 15 minutes for a P1, such as a NameNode down, a re-replication storm or frozen YARN queues, around the clock. A written root-cause analysis follows every P1. P2 is 1 hour, P3 is 4 hours and P4 is the next business day.
How does a Hadoop engagement start, and how do you work with our team?
It starts with a scoping call, booked in our reply within 1 hour of your request, then a cluster and inventory review of 1 to 2 weeks and written findings within a week. Changes are made with your engineers in staged steps, and the engagement ends with runbooks. Your team keeps ownership of the cluster.
What does migrating off Hadoop to a lakehouse involve?
An inventory of what is actually used, then moving data from HDFS to object storage, converting Hive tables to Delta Lake, converting jobs and mapping Ranger or Sentry permissions. Every workload runs in parallel against the old cluster until results reconcile. AceMQ starts with an honest assessment, not a pitch.
Should we run Hadoop ourselves or have AceMQ manage it?
Run it yourself if you still have engineers who know HDFS and YARN internals and can hold the pager. AceMQ managed operations suit teams that do not: AceMQ operates your clusters on-premises, in your cloud account, in an air-gapped site or on AceMQ infrastructure, covering patching, capacity, Kerberos upkeep and on-call, while a migration is planned.
Can we work with AceMQ on Apache Hadoop without a long contract?
Yes. AceMQ works on Apache Hadoop in two ways: ad hoc engagements for a defined piece of work, such as a health check, an upgrade or an incident, or an annual partner engagement that covers 24/7 support, proactive reviews and named engineers. Many teams start ad hoc and move to an annual partnership once the first engagement is done.
How much does AceMQ Apache Hadoop support or consulting cost?
Every AceMQ proposal is tailored to your requirements: your Apache Hadoop environment, the SLA you need, the hours of cover and the scope of work. Most contracts run $24,000–72,000 a year, depending on the SLA, the scope and how Apache Hadoop is deployed, with aggressive discounts when several technologies share one contract. Request a quote and AceMQ replies within 1 hour.