Overview
A typical engagement starts with a set of OpenVPN gateways serving staff and site connections, installed over several years on different OpenVPN versions. Some run 2.5, which endoflife.date lists as end of life, certificates are due to expire, and failover has never been tested. The team wants a plan it can run with its own engineers.
Challenge
Each gateway has its own configuration history. Options such as the cipher setting behave differently across 2.6 and 2.7, a revocation list has to reach every gateway, and a certificate rotation done in the wrong order leaves clients rejecting the gateways. High availability is a client profile with several remote entries and has never been exercised under load.
Environment
OpenVPN Community on Linux gateways in two data centers and one cloud account, with an internal CA, client profiles distributed by endpoint management and a load balancer in front of the cloud gateways.
Approach
AceMQ engineers inventory every gateway's version, configuration and certificates, then read the release notes against the options in use. They write the upgrade and rotation order, with trust distributed to clients before any gateway presents a new certificate, and rehearse it on a staging gateway with real client profiles. Failover is tested on a staging pair before the plan relies on it.
Solution
- Inventory of OpenVPN versions, configuration files, CA and certificate expiry dates for every gateway
- Review of options against current defaults, including moving cipher choices to --data-ciphers where --cipher is still set
- Certificate rotation order with trust distributed first, one gateway at a time and a revocation list update on each
- Failover design covering client remote lists, retry settings and the load balancer in front of the cloud gateways
- Check of data channel offload use per Linux gateway
- Staged upgrade plan to 2.7 with a rollback point and a client compatibility check at each step
Outcome
The engagement delivers a written plan the network team can run with its own engineers: the gateway inventory, the ordered upgrade and rotation steps with rollback points, the failover design and its test results from staging, and runbooks for the next rotation.