Edition Right-Sizing
VVF priced against VCF on the same cores, and a check of which VCF-only components you run.
Reduce VMware Costs
Last reviewed by Tyler Eastridge
A VMware renewal is now priced per physical core, with a 16-core minimum per CPU and a 72-core minimum per order. Five levers move the number: edition right-sizing, a core-count audit, term length, co-termination and third-party support. Send us your quote for a second opinion and we reply within 24 business hours.
Is This You?
A renewal quote arrived and the total is far above what your hosts suggest
A small estate is being billed as 72 cores
The quote is for VMware Cloud Foundation and nobody can name the NSX or automation requirement behind it
The core count on the quote was carried forward from last year without a host inventory
You were offered only a one-year term, or only a five-year one
Several VMware subscriptions expire on different dates
Your virtualization estate is on perpetual keys and Broadcom support is ending
You want a second view before you sign
Outcomes
Concrete state changes, not deliverable counts. This is what actually differs about your VMware estate when the engagement closes.
Before
A renewal arrives as one number, with no view of how much is rate, how much is the minimum and how much is term.
The core count rebuilt from your hosts, the two minimums shown, and the editions and terms priced side by side.
Before
VMware Cloud Foundation is quoted because it was last year's edition.
VVF priced on the same cores, and a plain answer on whether the VCF-only components are in use.
Before
The term on the quote is the only term anyone asked for.
One, three and five-year terms compared, with what each commits you to.
Before
You cannot tell whether a lower number is possible without a project.
A written second opinion on the quote you already hold, before you sign.
Scope
VVF priced against VCF on the same cores, and a check of which VCF-only components you run.
Cores rebuilt from a host inventory with the 16-core CPU floor and the 72-core order minimum applied.
One, three and five-year terms priced side by side, with what each locks in.
Subscriptions that expire on different dates reviewed for a single renewal date.
Whether perpetual licenses can be supported outside Broadcom, and what that cannot cover.
Send the quote. You get a written view of the inputs behind the number.
The Engagement
Every phase has a defined duration and a concrete artifact handed over at the end of it. You always know what stage you're in and what you've received.
You send the quote, the expiry date and your core count or a host export. We reply within 24 business hours.
You receive
We rebuild the core count from your hosts and apply the CPU floor and the order minimum, then compare it with the count on the quote.
You receive
We price VVF and VCF on the same cores and the one, three and five-year terms side by side.
You receive
A short written view of what in the quote can move and what cannot, and what each change commits you to.
You receive
Broadcom publishes no rate card for VMware cost reduction to start from, and a partner quotes against the same programme, so the per-core rate is not where most of the movement is. The movement is in the inputs: which edition, how many cores, how long a term, when the subscriptions end and what support you buy. These are the five, with how each works and what it asks of you.
| Lever | How it works | Effort | Main limit |
|---|---|---|---|
| Edition right-sizing | VVF and VCF are separate bundles, each priced per core. If the VCF-only components are not deployed, the same cores can be quoted as VVF. | Low to medium: an inventory of what is deployed | The edition is fixed inside a term, so the decision is made at renewal |
| Core-count audit | The quote bills every CPU at no fewer than 16 cores and the order at no fewer than 72. Rebuilding the count from hosts finds retired hosts and inflated carry-forward numbers. | Medium: a host export reconciled to your records | Cores can be added inside a term but not reduced |
| Term length | Terms run one, three or five years. On AceMQ's VVF quotes the three-year per-core rate sits below the one-year rate. | Low: ask for all terms priced | A longer term commits you to the cores and edition for its length |
| Co-termination | Subscriptions that expire on different dates are brought to one end date so you renew once, count cores once and review one order. | Medium: depends on the entitlement records | How it is applied is Broadcom's rule, so get it confirmed in writing |
| Third-party support | On perpetual licenses, a third-party provider can replace Broadcom support instead of a subscription renewal. | Medium: a contract review with legal | No Broadcom patches, no new hosts beyond the key, no move to a current version |
Broadcom completed its acquisition of VMware on 22 November 2023 and stopped selling perpetual licenses on 13 December 2023 (dates from Wikipedia's VMware article), so VMware customers now renew a subscription, and VMware pricing is per physical core. If your quote shows a price increase, the first job is to split it into quantity, edition, term and rate, because each moves for a different reason.
Two minimums decide the quantity before a rate applies. Every CPU is licensed as at least 16 cores, and every order covers at least 72. A two-host estate with 32 physical cores is billed for 72, more than double what it runs. After the quantity comes the rate, which depends on your Broadcom account, and the two together set the license cost on the quote.
| Edition | 1-year term | 3-year term |
|---|---|---|
| vSphere Foundation (VVF) | $117–196 | $100–160 |
| Cloud Foundation (VCF) | ~$344 (one quote) | $257–348 |
These are ranges from real quotes, the same ones published on the VMware licensing page. They are not a rate card and not an offer.
VCF is the full private cloud platform: it adds NSX, VCF Automation and SDDC Manager to the hypervisor, vCenter and vSAN layer that VVF carries, and it includes more vSAN per core. The right-sizing question is whether any of those are in use. If they are not, the same cores can be quoted as VVF. The edition cannot be changed part-way through a term, so the check belongs before you sign.
The count on a quote is often last year's number. Rebuild it from a host inventory such as an RVTools export: each CPU at no fewer than 16 cores, the hosts added up, the total raised to 72 if it is lower. Hosts that were retired, test clusters that no longer run and hardware that is about to be decommissioned all show up here. The bill follows physical cores, not the number of VMs, so adding a VM to a licensed host adds no cost and the question to ask is whether the same VM workload could be consolidated onto fewer or denser hosts before the order. The 16-core floor and the 72-core minimum set how far that can go. Because cores can be added inside a term but not removed, the audit is worth doing before the order, not after.
One-year, three-year and five-year terms are all available, and AceMQ's VVF quotes show a lower annual rate on the longer term. A longer term trades flexibility for a lower per-core rate and fixes the cores and edition for its length. A one-year term keeps options open while an updated vSphere Standard is awaited. Ask for the terms priced side by side so the trade-off is visible.
When subscriptions end on different dates, each renewal is its own negotiation, its own count and its own deadline. Bringing them onto one end date means one inventory, one order to review and one date to manage. How a given set of subscriptions can be aligned depends on the entitlement records and on Broadcom, so ask whoever quotes you to confirm the end date and the cost of alignment in writing before you rely on it.
For estates that still run perpetual licenses, independent providers sell support in place of Broadcom's. It suits a frozen estate with no growth plan and no requirement for vendor patches. It does not renew a subscription, cannot issue Broadcom patches and cannot add hosts beyond what the key covers, so treat it as a bridge with a defined end.
Send the quote you hold. AceMQ is a Broadcom partner, so a second opinion can end in our own quote, and you are free to take it elsewhere. If you would rather ask an independent adviser, the comparison of renewal partners lists one.
This page does not state a savings percentage, and any figure you see elsewhere should be asked for its basis.
FAQ
Five inputs move a renewal quote: the edition, the core count, the term, the end date and the support you buy. Price VVF against VCF on the same cores, rebuild the core count from a host inventory, ask for the one, three and five-year terms side by side, and check whether separate subscriptions can share an end date. No saving is guaranteed in advance. Send us your quote for a second opinion and we reply within 24 business hours.
Per core per year, usually yes. On AceMQ's 2026 quotes VVF ran $117–196 per core per year on one-year terms and $100–160 on three-year terms, and VCF $257–348 on three-year terms against about $344 on the one one-year quote. A longer term also commits you to the cores and edition for its length, so compare the terms rather than choosing on rate alone.
Yes. Renewal is the point where the edition, the core count and the term are all open. Inside a term, cores can be added but not reduced. At renewal the count is rebuilt from your hosts, with every CPU at no fewer than 16 cores and the order at no fewer than 72, so a small estate cannot go below the minimum.
Yes, at renewal. The edition is fixed inside a term, so the change is made when the new term is priced. Ask for VVF quoted on the same cores, and check that your vSAN raw capacity fits the smaller VVF entitlement of 0.25 TiB per core.
Only for estates that still run perpetual licenses. A third-party provider sells support in place of Broadcom's, but it does not renew a subscription, cannot issue Broadcom patches and cannot add hosts beyond the key. It suits a frozen estate with no compliance requirement for vendor patches.
Check five items. Raw vSAN capacity above the entitlement is a separate add-on. AVI Load Balancer, VMware vDefend Firewall and VMware Live Recovery are licensed separately from VCF. Add-ons do not necessarily follow the per-core model. License usage has to be reported at least every 180 days. And the expiry date matters: after 90 days past expiry, ESX hosts disconnect from vCenter. Ask for each as a line item on the quote.
Existing keys keep running the version they cover, and Broadcom says they do not need upgrading to keep running version 8. Broadcom stopped selling perpetual licenses on 13 December 2023, and its VCF 9.1 FAQ says customers with perpetual licenses must switch to subscription licenses before upgrading to VCF 9. The renewal is the point at which to price that switch against staying on version 8.
Per core, yes. On AceMQ's 2026 three-year quotes VCF ran $257–348 per core per year against $100–160 for VVF. VCF adds NSX, VCF Automation and SDDC Manager and includes more vSAN per core, so the question is whether you deploy them. Price both on the same cores before you choose.
Let's talk
Send the quote, the expiry date and your core count. We reply within 24 business hours.